Prime Minister Narendra Modi on Saturday inaugurated Nitish Setu, a six-lane extradosed cable-stayed bridge over the River Ganga in Bihar’s Vaishali district, giving north and south Bihar a major new road link.
The Prime Minister walked on the bridge for a few minutes and waved to the crowd after dedicating it to the nation. Bihar Governor Syed Ata Hasnain, Union Minister Chirag Paswan and Bihar Chief Minister Samrat Choudhary were present at the ceremony. Earlier in the day, Modi met former Bihar chief minister Nitish Kumar at Patna airport.
The inauguration was part of a wider development programme in Bihar. Modi also inaugurated and laid the foundation stone for 227 projects worth around Rs 34,470 crore in Vaishali district, and flagged off 100 PM-eBuses.
A 19.7 km corridor across the Ganga
Nitish Setu was built at a cost of around Rs 4,280 crore, according to a statement from the Prime Minister’s Office. The full connectivity corridor stretches 19.7 km, comprising a 9.76 km main bridge over the Ganga and about 10 km of approach roads.
The bridge links Kachhi Dargah on National Highway 22 in Patna district with Bidupur on National Highway 322 in Vaishali district, passing through Raghopur Diyara Island. Built as a six-lane extradosed cable-stayed structure with pedestrian pathways, it is around 32 metres wide, with spans of up to 150 metres between its main supporting pillars.
The project was executed under the Bihar State Road Development Corporation Limited on an engineering, procurement and construction model. Construction was carried out by a joint venture of Larsen and Toubro and South Korea’s Daewoo Engineering and Construction.
Fourteen years from plan to opening
The bridge has a long history. It was first taken up in 2012, when Nitish Kumar was Bihar’s chief minister. The foundation stone was laid in August 2015, and full construction work ramped up in 2017.
The first stretch, connecting Kachhi Dargah to Raghopur Diyara Island, was opened to traffic on June 23, 2025. The Bihar government named the completed structure Nitish Setu on November 13, 2026, days before the inauguration.
Modi said the bridge had been named in honour of Nitish Kumar as a recognition of his contribution to Bihar. “In honour of the respected Nitish ji, this modern bridge has been named ‘Nitish Setu’,” the Prime Minister said.
What the bridge changes for Bihar
The new crossing is expected to ease congestion on the existing Ganga bridges, Mahatma Gandhi Setu and JP Setu, while speeding up freight, agricultural movement and commuter travel between Patna and Vaishali.
Residents of Raghopur Diyara Island, long cut off by river channels, gain more dependable year-round access to healthcare, education and markets in Patna. Officials also expect the Bidupur to Kachhi Dargah corridor to draw investment as it develops into a centre for tourism and logistics.
The wider package of projects launched alongside the bridge covers roads, energy, urban infrastructure, water resources, education, healthcare and transport. It includes road works worth over Rs 15,600 crore and the inauguration of the 660 MW second unit of the 1,320 MW Buxar Thermal Power Project.
A naming row around Nitish Setu
The naming of the bridge has triggered a political slugfest between the ruling BJP-JD(U) alliance and the opposition Rashtriya Janata Dal. RJD working president Tejashwi Yadav questioned the decision to name the bridge after the JD(U) chief, alleging that the BJP was trying to signal that Nitish Kumar’s political career was over.
“It is well known that when a person is alive, his statues are not erected nor are bridges named after him. So, maybe, they are trying to send across the message that Nitish Kumar is politically finished,” Yadav said, according to PTI.
Yadav said his party had earlier proposed naming the bridge after Akshayvat Rai, a freedom fighter and close associate of former Bihar chief minister Karpoori Thakur. The BJP hit back, with state spokesperson Kuntal Krishna saying the bridge was testimony to development under Nitish Kumar’s leadership.
Frequently Asked Questions
When was Nitish Setu inaugurated?
Prime Minister Narendra Modi inaugurated Nitish Setu on Saturday, November 21, 2026, in Bihar’s Vaishali district.
How long is Nitish Setu and what did it cost?
The full corridor is 19.7 km, with a 9.76 km main bridge over the Ganga and 10 km of approach roads. It was built at a cost of around Rs 4,280 crore.
Which places does Nitish Setu connect?
The bridge connects Kachhi Dargah on NH-22 in Patna district with Bidupur on NH-322 in Vaishali district, passing through Raghopur Diyara Island.


